Your Roof Replacement Proposal

Roof assessment, recommended roofing solution, project investment, warranty, and next steps.

Customer Information
Project Information
Project Type
Existing Roof Assessment

Roof Access

Existing Roof Conditions

Every Roofing-MTL Roof Replacement Includes

Property Protection

We protect landscaping, decks, walkways, siding and surrounding property where required before work begins.

Roof Preparation

All necessary existing roofing materials, debris, and project waste are removed from the property and responsibly disposed of by Roofing-MTL.

Roof Deck Inspection

The roof deck is inspected after tear-off. Includes up to two (2) damaged plywood sheets if required.

Professional Installation

Installed according to manufacturer specifications and Quebec building standards.

Complete Cleanup

Property cleanup, debris removal, magnetic nail sweep and final quality inspection.

Warranty

15-year Roofing-MTL workmanship warranty plus applicable manufacturer material warranty.

Roof Deck Contingency

Why this matters

The condition of the roof deck cannot be fully confirmed until the existing roofing materials are removed.

This proposal includes up to two (2) sheets of damaged plywood decking if required.

Additional damaged decking is reviewed and approved before proceeding.

Recommended Roofing Solution

Roofing System 1

Roofing System 2 / Additional Roofing Area

Roofing System 3 / Additional Roofing Area

Roof Components
Drainage Improvements (if required)
Roofing Details & Pricing
ItemMeasurement / NotesRateTotal
Flashings
Drip Edge
Edge Metal
Counter Flashings
Materials Delivery
Disposal
Additional Work & Notes
Project Investment Summary

Project Costs

Investment Summary

Payment Schedule

The standard deposit is $500. The remaining balance is divided equally between the second and final payments.

Proposal Decision

I understand the final price may change slightly once material availability and pricing are confirmed, or if unforeseen site conditions are discovered. Significant changes will be discussed before proceeding.

Preferred Follow-up Method

What Happens Next

1. Proposal

We answer questions and finalize the scope of work.

2. Approval & Scheduling

Agreement is signed, materials are confirmed, and work is scheduled.

3. Roof Replacement

Our crew completes the roof replacement according to the approved scope.

4. Final Inspection

Walkthrough with client. Warranty certificate and final invoice are provided.

Acceptance
Sign here
Roof Replacement Systems — Layers Explained

Shingle Roof Replacement

Exploded illustration of typical shingle roof layers
  1. Roof deck: Existing plywood is inspected and repaired or replaced where required.
  2. Drip edge: Perimeter metal directs water away from the roof edge.
  3. Ice & water shield: Self-adhered protection at vulnerable locations such as eaves, valleys, walls and penetrations.
  4. Synthetic underlayment: A secondary water-shedding layer over the roof deck.
  5. Starter shingles: Installed along eaves and rakes to secure and seal the first course.
  6. Architectural shingles: The primary finished roofing surface.
  7. Ridge shingles and ventilation: Ridge finishing and roof ventilation are installed where specified.

Illustration is representative. Exact components and coverage depend on the approved roofing system and site conditions.

Membrane Roof Replacement

Exploded illustration of typical membrane roof layers
  1. Roof deck: The structural deck is inspected and repaired or replaced where required.
  2. Vapour barrier or attachment layer: Included where required by the selected assembly.
  3. Insulation or tapered insulation: Added where specified for thermal performance or improved drainage.
  4. Cover board: Provides a stable, durable substrate where included in the system.
  5. Base layer: Base sheet, primer, adhesive or system-specific attachment layer.
  6. Finished membrane: SBS cap sheet, EPDM, TPO or PVC membrane according to the approved system.
  7. Flashings and drainage details: Perimeters, walls, penetrations, drains and scuppers are integrated into the membrane system.